450 kilometres of resurfacing for southern Interior in 2018

BARRIERE – A resurfacing project on Highway 5 near Barriere that is now well underway, marks the beginning of a busy season of resurfacing in the southern Interior region, covering more than 450 kilometres of highways and side roads.

“We have promised safer roads for the people of B.C., and paving more than 450 kilometres in this region alone this year will make a big difference to local residents and those traveling through the region,” said Minister of Transportation and Infrastructure Claire Trevena. “By maintaining high-quality roads and highways, we are improving peoples’ safety and keeping commercial goods moving.”

This first project on Highway 5, between Agate Bay Road and Darfield, includes 16 kilometres of resurfacing. Dawson Construction of Kamloops was awarded the $4.6-million contract for the work, which is now underway and is expected to be completed this spring.

A second project in the area will be resurfacing Highway 24, from the brake check to Highway 24/5 Junction near Little Fort (13 kilometres).

More than $85 million is being invested in highway and side road improvements in the southern Interior in 2018.

Other major resurfacing projects taking place in the region this spring and summer include:

Highway 3/95 near Creston – Resurfacing 36 kilometres of Highway 3, from Arrow Creek Road to Yahk; 11 kilometres of Highway 95, from Kingsgate to Curzon; and 23.5 kilometres of selected side roads in the Kitchener, Arrow Creek, Kidd Creek, Kingsgate, Yahk and Moyie areas.

Highway 5 near Merritt – From Portia Bridge to Kingsvale, resurfacing 38 kilometres of the Coquihalla Highway.

Highway 12 near Lillooet – 46 kilometres of resurfacing from Lytton to Lillooet, and 2.5 kilometres of overlay paving on Road 40, north of Lillooet, from Hollywood Crescent to Dickie Creek Bridge.

Highway 26 near Quesnel – Resurfacing 44 kilometres, from Wingdam to Barkerville.

Highway 97 in Kelowna – 4.6 kilometres of resurfacing, from Gordon Drive to the junction with Highway 33; 5.6 kilometres, from Edwards Street to Old Vernon Road; and 5.5 kilometres on Old Vernon Road, from Spencer to McKenzie. In addition, there will be intermittent paving between Abbott Street and Gordon Drive.

The following projects make up the rest of what will be resurfaced in the southern Interior in 2018:

* Highway 1, from Glacier National Park to Donald Bridge and selected side roads near Golden (37 kilometres)

* Highway 3, from Kootenay Pass Summit to Summit Creek near Creston (28 kilometres)

* Highway 3 and 3A, from Ooteschenia near Castlegar to Playmor Junction at South Slocan (20 kilometres)

* Highway 5, from the Nicola Interchange to Clapperton Brake Check and Coldwater Road near Merritt (32.5 kilometres)

* Highway 20, from Jourdenais Road near Hagensborg to Atnarko Slough (50 kilometres)

* Highway 20, from Redstone to the Alexis Creek/Nazko Road and McCullough Road (26 kilometres)

* Highway 97, from Deep Creek Bridge near Peachland to Glenrosa Road in West Kelowna (15 kilometres)

* Chimney Lake Road and other side roads in Williams Lake (28.5 kilometres)

* North Fork Road north near Grand Forks (25 kilometres)

While these resurfacing projects are underway, drivers can expect minor delays and, at times, single-lane alternating traffic.

Drivers are reminded to slow down, obey traffic control personnel, and to check DriveBC.ca for the most up-to-date highway information.

Follow the work of the Ministry of Transportation and Infrastructure online at: http://www.tranbc.ca

Just Posted

MARS Wildlife Rescue offers some tips on keeping hummingbird feeders clean

Mould from dirty hummingbird feeders can be fatal

30 degrees and warmer forecasted with heat wave in B.C.

The weather could stay well into next week, according to Environment Canada

‘Daddy bonus’ common in B.C. workplaces, study finds

UBC researchers say dads don’t have to be number one in the office to get a raise

Northern Health Authority expands medical bus use

Over 60 or have mobility challenges? You can now travel on Northern Connections.

B.C. Place will miss out on World Cup soccer celebration

Premier John Horgan doesn’t ‘regret for a minute’ pulling out

REPLAY: B.C. this week in video

In case you missed it, here’s a look at replay-worthy highlights from across the province this week

B.C. NHL prospect expected to make ‘full recovery’ after an incident in Calgary

Jordy Bellerive was injured in a reported house fire Saturday night

BC Lions defensive back Marcell Young levels streaker in home opener

Young hit the fan near one of the 45-yard lines

Police: Taxi driver who hit 8 Moscow pedestrians fell asleep

Two Mexican World Cup fans were among those hit

B.C. VIEWS: Orphans of our urban drug culture neglected again

Child advocate Bernard Richard leaves B.C. with harsh message

From marijuana beer to pot cookies, Canadian companies creating cannabis edibles

Manufacturers think that edibles will do well with users who don’t want to smoke or vape

Privacy lawyer warns against victim blaming in recent sextortion scams

Perpetrators get sexual photos of the victim and threaten to share them with friends and families

QB Jennings leads Lions to 22-10 win over Alouettes

B.C. wins CFL home opener over Montreal

Most Read