Members of the We, the Secwépemc Unity Camp to Stop the Trans Mountain Pipeline took their message to Trans Mountain's worksite off Mission Flats Road on Oct. 15, 2020. - Facebook

RCMP arrest at least one person at Trans Mountain worksite in Kamloops

Protesters walked across Canadian Pacific Railway tracks and onto the Trans Mountain site

  • Oct. 15, 2020 4:06 p.m.

-Kamloops This Week –

At least one person has been arrested at the Trans Mountain construction site on Mission Flats in Kamloops.

Members of the We, the Secwépemc Unity Camp to Stop the Trans Mountain Pipeline walked across Canadian Pacific Railway tracks on Thursday (Oct. 15) and onto the Trans Mountain site. There, at least one protester, a woman, sat on an excavator and called for others opposed to the pipeline expansion project to help stop the work being done.

When Trans Mountain employees told protesters they were violating a B.C. Supreme Court injunction prohibiting the obstruction of access to Trans Mountain’s worksites and that they must leave, a protester responded by saying they would stay.

Kamloops Mounties were called and, at about 2:30 p.m., the arrest — which was aired live on Facebook — took place. One of the protesters at the scene told KTW five people had been arrested, but police at the site would not confirm how many people had been taken into custody.

The arrest video is one in a series of Facebook Live videos posted to the page “We, the Secwépemc: Virtual Unity Camp.”

Protesters can be seen walking up from the beach and into the entrance of the worksite from Mission Flats Road. They can be seen and heard chanting and drumming: “No more pipelines on stolen native land” and “We will fight until we win.”

About 15 protesters can be seen at the scene in one video. At one point, an eviction notice is taped to the fence.

In the videos, protesters cite safety concerns for the river and salmon populations within it. They also argued the pipeline expansion work is being done on unceded Secwépemc territory.

The site where the protests are occurring is where Trans Mountain workers are in the process of drilling under the Thompson River in preparation of dragging the pipeline below the riverbed, from near Kamloops Airport to the Mission Flats area.

READ MORE: Permanent protest camp established near Trans Mountain work site in Kamloops

The camp was established on Oct. 3 on a beach just west of the Domtar pulp mill, off Mission Flats Road.

The protest camp followed previous public acts opposing the project.

In August on Mission Flats, a Secwépemc man held a vision quest and fast. In early September, a Secwépemc woman affiliated with the encampment protest chained herself to a Trans Mountain worksite near Kamloops Airport. She was charged, released and had to attend court in Vancouver.

On Sept. 30, RCMP arrested a Merritt woman who refused to leave a Trans Mountain worksite near Hope after parking her vehicle in a manner that prevented workers from conducting operations. She was released at the scene, with charges pending.

There are 28 kilometres of pipeline work in Kamloops. The twinned pipeline route through Kamloops will run along the edge of the Lac du Bois Grasslands above Westsyde and Batchelor Heights before crossing Ord Road and Tranquille Road near Kamloops Airport, then crossing under the Thompson River.

Kamloops is part of Trans Mountain’s Interior construction area that begins at Black Pines and runs to the Coquihalla Summit, which includes approximately 185 kilometres of 36-inch pipeline, 18 valve assembly installations and three pump stations. The pipeline begins in Edmonton and ends in Burnaby.

Prime Minister Justin Trudeau’s Liberal government purchased the pipeline and related infrastructure from Kinder Morgan for $4.5 billion in 2018.

READ MORE: RCMP investigate homicide in Merritt

Like us on Facebook and follow us on Twitter.

#TransMtn

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

COVID-19. (Courtesy of CDC).
Interior Health reports 12 additional COVID-19 cases

The total number of cases in the region is now at 644

Paradigm Building Solutions CEO Stefan Maunz explains some of the technology being utilized at the facility in the Louis Creek Industrial Park to Simpcw First Nation Councilor Jules Phillips and Kamloops-Thompson-Cariboo MP Cathy McLeod. (Jill Hayward Photo)
Paradigm – third in the World and first in Canada, opens in Louis Creek Industrial Park, Barriere, B.C.

Unique manufacturing technology for sustainable housing solutions through high-end prefabrication

A group photo taken at the grand opening of Barriere Library’s permanent StoryWalk® in Fadear Park on Tuesday, Oct. 20, includes representatives from Thompson Nicola Regional Library including Barriere Head Librarian Pam Rudd and assistant Lisa Copely, District of Barriere Acting Mayor Donna Kibble with Councilors Judy Armstrong and Al Fortin, Barriere Literacy Outreach Coordinator Jill Hayward, Visual Science and Awards managing partner Robert Trudeau, plus a number of area library supporters. (Tasha Buchanan Photo)
StoryWalk® installed in Barriere’s Fadear Park

Take a walk, read a book, have an adventure

District of Barriere Utilities Manager reports to council on Barriere wells

District of Barriere Utilities Manager Ian Crosson presented a verbal report during… Continue reading

(Metro Creative photo)
Mammograms save lives

Mobile screening coming to Barriere

Actor Ryan Reynolds surprised a Shuswap family with a special birthday message to their son who was worried he’d be alone on his 9th birthday on Nov. 24. (Tiffanie Trudell/Facebook)
Ryan Reynolds text almost gives away Shuswap boy’s birthday surprise

Deadpool actor helps remind eight-year-old Canoe resident he’s not alone

Vancouver police reactivated the search for Jordan Naterer Thursday Oct. 22. Photo courtesy of VPD.
Mom of missing Manning Park hiker believes her son is waiting to come home

‘He’s going to come out of a helicopter and say ‘what took you so long?”

Environment Minister George Heyman, Premier John Horgan and Energy Minister Michelle Mungall announce that B.C. Hydro is proceeding with construction of the Site C dam, Dec. 11, 2017. (Tom Fletcher/Black Press)
Site C actions, costs won’t be known until after B.C. election, Horgan says

Peace River diverted for construction of reinforced dam base

One of the squirrels who ended up having their tails amputated after getting them stuck together with tree sap. (Facebook/Wild ARC)
Squirrels recovering from tail amputation after sap situation near Victoria

BC SPCA Wild ARC says squirrels will be released back into wild, fifth sibling was euthanized

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

More and more electric cars are on the road, but one Chevy Bolt owner was shocked to see how much his BC Hydro bill skyrocketed once he started charging the vehicle. (Black Press file photo)
Lower Mainland man sees significant spike in BC Hydro bill after buying electrical vehicle

An increase should be expected, but Brian Chwiendacz experienced a 200-plus per cent hike

The Anonymous YVR is an Instagram page that reviews restaurants and other establishments around B.C. based on how well they adhere to COVID-19 rules. (Instagram)
Anonymous Instagram page reviews COVID-19 safety measures at B.C. businesses

There are a number of public health orders various types of establishments must follow to slow virus’s spread

Most Read